Official opening of the completed Katimamulilo Bridge by His Excellencies the Presidents of Namibia (Mr Sam Nujoma) and  Zambia (Mr L P Mwanawasa SC) in 2004
The newly commissioned Katimamulilo Bridge - Linking Zambia and Namibia on the Zambezi River.
GM International installing Asphalt Plan for hte Lima Motel - ZCCM Underpass section of T3 in Chingola Town 
Installed Asphalt Plant for the Lima Motel-ZCCM underpass section of T3 in Chingola 
Lima-Motel to ZCCM Underpass - Main road through Chingola Town - Works by GM International
Raubex/BG&M laying Asphalt on one of the selected sections for strengthening on T5 Chingola-Solwezi road project 
 

Chingola-Solwezi Road - being worked on by Raubex

Inspection of Chingola-Solwezi works by Board members
Emergency Zambia Army Bailey Bridge erected at Nkalamabwe crossing on the diversion road downstream of the washaway on road T4
Bailey Bridge at Nkalamabwe washaway site on Great East Road T4 in Chinyunyu area
Diversion road on Nakalamabwe washaway
T2 - Mukalashi Basic School Road in Chibombo District.  Works undertaken by by PUSH using Labour intensive method  with EDRP funding 
 

Rehabilitation of one of the community roads in Mukalashi Area of Chibombo District - works by PUSH with EDRP funding

Launch of ROADSIP II and Annual Work Plan 2005 Seminar held on Monday,  4 October 2004 at Mulungushi International Conference Centre, Lusaka
Official launch of ROADSIP II and Annual Work Plan Seminar 2005 by Ministry of Communications (MCT) and Transport & Ministry of Works and Supply
MCT Minister Bates Namuyamba emphasizing a point during the launch and seminar
Acting Permanent Secretary giving a speech
Acting Permanent Secretary deliberating during the seminar
Members of the donor community present  at the seminar - JICA, Germany, World Bank, Danida, EU, KfW Germany ILO 
Provincial Permanent Secretaries Eastern  and Luapula concur at the seminar
Team Leader ROADSIP Southern Africa Region, Ben Gericke (centre) and PS, MWS Col. Bizwayo Nkunika (right)  during break time 
Annie, Baison and Richard operating the PowerPoint Projector - Ministry of Local Government and Housing  presentation
Members of the Association of Labour-based Small scale contractors present at the launch and seminar.
Chairman Road Traffic and Safety Agency(RTSA) W Harrington, board member RTSA G Lewis and Chairman Roads Development Agency W Lisulo discussing at the seminar
Muladel Roads Works took advantage to exhibit their products at the seminar - 
Zambia National Commercial Bank, Barclays Bank and Zambia Revenue Authority officials present as stakeholders at the launch and seminar.
Dr Mutamba Bull (right) Board member National Council for Construction greeting MCT and MLGH ministers at the seminar.
NRB Inspection Tour of Eastern Province - 28 - 31 July 2004
Performance Routine Maintenance on one of the feeder roads in Chipata District:  Madzimoyo on Great East Road to Jerusalemu on Chipata-Chadiza Road (D128)
Drift on newly constructed Kamwala-Prison Road in Chadiza District - Funded by EDRP
Culvert construction in one of the township Roads in Petauke Township - Eastern Province:  Work by GM International 
Periodic Maintenance of Sinda-Katete Section of Great East Road by Sable Transport
A Cross Junction of township roads recently rehabilitated by Sable Transport in Nyimba Town
One of the sections of Great East Road between Sinda and Katete undergoing reconstruction.  Here is a section where reconstruction has been completed up to cement  stabilised base.
NRB Inspection Tour of North-Western/Copperbelt Provinces - 21 to 24 July 2004
One of the feeder roads being maintained under the Emergency Drought Recovery Project (EDRP) in Mwinilunga District located on the Western Bank of Lunga River in Mwinilunga
EDRP Project in Chief Kanongesha's Area in Mwinilunga District
One of the feeder roads maintained under EDRP in Mwinilunga District located between Mwinilunga Airport at Kawiku and Mwinilunga Trades Training Institute.
Rehabilitation of main road through Chingola Town from Lima Motel to ZCCM Underpass.  This is the tail-end at the Underpass.  GM International at work while Mr Joseph Chileshe, NRB member inspects the works.
GM International at work on main road through Chingola Town from Lima Motel to ZCCM Underpass.  work nearing completion at the ZCCM Underpass end.
Newly reconstructed main road through Chingola Town from Lima Motel to ZCCM Underpass.  This is the tail-end of the section near ZCCM Underpass facing Chingola Town 
Stream crossing have hindered progress of road rehabilitation in some of the roads in Mwinilunga District.  EDRP road project awaiting supply of materials for bridges.
Mr Nadarajah Gananadha Outgoing Executive Secretary - National Roads Board presenting a  speech during his farewell accorded to him by NRB at the Taj Pamodzi Hotel, Lusaka on 26 December 2003 
Mr Henry Chipewo Chairman, National Roads Board presenting a speech at the farewell for Outgoing Executive Secretary as Incoming Executive Secretary Mr Raphael Mabenga looks on
Mr I Kashoka, Permanent Secretary, Ministry of Communications and Transport presenting a speech at the farewell
Mr Kashoka presenting a a well deserved gift to Mr Gananadha at his farewell
Mr Kashoka presenting a gift to Mr Gananadha's supportive wife, Mrs B Gananadha
Mr Gananadha showing off his well deserved gift to the crowd - 'Copper clock on the map of Zambia'
Mrs Gananadha with her onamental silva gift
Mr R Mushinge, Chairman of the Association of Consulting Engineers in Zambia giving a speech at the farewell
Mr E Mpondela, Marketing Director, Phoenix Contractors giving a speech on behalf of contractors in Zambia at the farewell
Mr & Mrs Gananadha and Mr Bizwayo Nkunika, Permanent Secretary Ministry of Works and Supply listening at the farewell 
National Task Force on ROADSIP Phase II at a meeting with Joint Donor and World Bank Mission on the Finalisation of ROADSIP II Programme - NRB 20 October 2003
The Outgoing Task Manager for ROADSIP (Mr Stephen Brushett), World Bank bidding farewell to the Board of Directors of National Roads Board - Taj Pamodzi Hotel, Lusaka - 27 October 2003
Board Meeting of the National Roads Board in progress with Joint Donor and World Bank Mission held on 27 October 2003 - Taj Pamodzi Hotel, Lusaka 
Meeting of Permanent Secretaries on RMI with Joint Donor and World Bank Mission discussing the Aide Memoir on Road Sector and the Launch of ROADSIP Phase II at a cost of US$1.6 billion over a ten year period - 30 October 2003 - Ministry of Communications & Transport
Meeting of Permanent Secretaries on RMI with Joint Donor and World Bank Mission discussing the Aide Memoir on Road Sector and the Launch of ROADSIP Phase II - 30 October 2003
Meeting of Permanent Secretaries on RMI with Joint Donor and World Bank Mission discussing the Aide Memoir on Road Sector and the Launch of ROADSIP Phase II - 30 October 2003
Chairman of the Board of Directors of National Roads Board presenting a gift to the outgoing Task Manager for ROADSIP at World Bank Mr Stephen Brushett and thanking him for his contribution to the implementation of ROADSIP Phase I - 27 October 2003 - Taj Pamodzi Hotel, Lusaka 
Chairman of the ROADSIP Steering Committee and Joint Donor Mission chairing the Joint meeting on Finalisation of ROADSIP II Programme at Taj Pamodzi Hotel, Lusaka on 27 October 2003 
Consultants on ROADSIP Phase II Bankable Document presenting their report at a meeting of the National Task Force with Joint Donor and World Bank Mission on ROADSIP programme aimed at rehabilitating and maintaining a core road network of 41,000km at a cost of US$1,600 million over a ten year period
Members of the ROADSIP Steering Committee, National Task Force  on ROADSIP II, Consultants on ROADSIP II Bankable Document and Joint Donor Forum at a Joint meeting held on 30 October 2003 at Taj Pamodzi Hotel, Lusaka 
Members of the ROADSIP Steering Committee, National Task Force  on ROADSIP II, Consultants on ROADSIP II Bankable Document and Joint Donor Forum at a Joint meeting held on 30 October 2003 at Taj Pamodzi Hotel, Lusaka 
Members of the ROADSIP Steering Committee, National Task Force  on ROADSIP II, Consultants on ROADSIP II Bankable Document and Joint Donor Forum at a Joint meeting held on 30 October 2003 at Taj Pamodzi Hotel, Lusaka 
Joint Inspection Tour of the Southern Province - NRB Board Members, Ministry of Works  and Supply and Ministry of Local Government and Housing - June 2003
wpeD.jpg (4372 bytes) NRB Inspection Team being shown round the new bridge at Katimamulilo by the Resident Engineer - Gauff Engineers
wpe10.jpg (3595 bytes) New Katimamulilo Bridge as work on the deck progresses from the western bank of the Zambezi River
wpeF.jpg (4775 bytes) Katimamulilo Bridge on the Zambezi River linking Zambia and Namibia
wpe11.jpg (5360 bytes) Inspection of the Katimamulilo Bridge
wpe12.jpg (3885 bytes) Livingstone-Sesheke Road under Construction
wpe13.jpg (3854 bytes) Division Road through the stream bed - Bottom Road in Sinazongwe District
Finalisation of ROADSIP II Bankable Document and Financial Strategy Meeting - June 2003
wpe14.jpg (4813 bytes) Consultants on Financial Strategy with members of the National Task Force on ROADSIP II discussing the draft report and the way forward - 11 June 2003
wpe15.jpg (4181 bytes) Consultants on Financial Strategy - 11 June 2003
wpe9.jpg (4595 bytes) NRB Board Meeting in session - 30 June 2003
wpeB.jpg (4595 bytes) Board Meeting in session
Road Sector Institutional Study Pre-bid Conference at Chrismar Hotel - 24 June 2003
wpe9.jpg (4274 bytes) Permanent Secretary Ministry of Works and Supply presenting at the Conference
wpeB.jpg (4024 bytes) Director, Planning Unit Ministry of Communications & Transport presenting at the conference
Accelerated Urban Roads - Chililabombwe before rehabiliattation:
wpe9.jpg (3863 bytes) Typical condition of road prior to rehabilitation works (Minor Scabbing)
wpeB.jpg (4870 bytes) Typical Edge Damage
wpeD.jpg (4050 bytes) Typical Pavement Failure
wpeF.jpg (4975 bytes) Conducting DCP Tests
Accelerated Urban Roads - Chililabombwe After Rehabilitation by Bicon (Z) Ltd.:
wpe11.jpg (4422 bytes) Typical surface after works
wpe13.jpg (4204 bytes) Road and shoulders after works
wpe12.jpg (4321 bytes) Typical road before line marking
Accelerated Urban Roads in Livingstone (Libala Road) Before Rehabilitation:
wpe9.jpg (5221 bytes) Typical condition of road prior to rehabilitation works (Pavement Stress)
wpeB.jpg (4867 bytes) Typical Pavement Stress
wpeF.jpg (5097 bytes) Existing wearing course stripping off
wpeD.jpg (4307 bytes) Damaged storm water drain
Accelerated Urban Roads in Livingstone (Libala Road) During and After Rehabilitation Works by Bicon (Z) Ltd.:
wpe10.jpg (5536 bytes) Surfacing works
wpe11.jpg (4421 bytes) Typical condition before line marking
wpe12.jpg (4450 bytes) Typical road before line marking
Accelerated Urban Roads - Mongu Before Rehabilitation:
wpe9.jpg (5252 bytes) Typical condition of Mbuyu Road prior to rehabilitation works
wpeB.jpg (4564 bytes) Typical condition of Mbuyu Road prior to rehabilitation works - severe erosion
wpeD.jpg (4750 bytes) Kalahari Sands on the Mbuyu Road
wpeF.jpg (4584 bytes) Heavy Craters formed on the road due to lack of drainage
Accelerated Urban Roads - Mongu During Rehabilitation by Bicon (Z) Ltd.:
wpe10.jpg (5881 bytes) In-Situ Material Testing - Mbuyu Roads
wpe11.jpg (5069 bytes) Severe erosion of drainage
wpe12.jpg (4515 bytes) Repair works - Slurry
wpe13.jpg (4006 bytes) Repair works - Slurry Seal
Periodic Maintenance of M15 Siavonga Road Project - Condition of Road Prior to Rehabilitation:
wpe14.jpg (3888 bytes) Typical condition of road prior to rehabilitation works
wpe15.jpg (4470 bytes) Typical pothole and condition of M15 Road prior to rehabilitation works
wpe16.jpg (4199 bytes) Condition of M15 Road prior to commencement of rehabilitation work
wpe17.jpg (5534 bytes) typical edge repair on M15 Road
Periodic Maintenance of M15 Siavonga Road Project During Rehabilitation by Bicon (Z) Ltd.:
wpe18.jpg (5270 bytes) Pothole patching on M15 Road
wpe19.jpg (4926 bytes) Field measurements on Potholes
wpe1A.jpg (4367 bytes) Shoulder rehabilitation on M15 Road
wpe1B.jpg (5181 bytes) Typical edge repair and pothole patching on M15 Road
wpe1D.jpg (5547 bytes) In-situ material testing of the road
wpe1E.jpg (4516 bytes) Cement stabilisation on the reconstruction of the road
wpe1F.jpg (4722 bytes) Reconstruction of section of the road
wpe20.jpg (3667 bytes) Reconstructed section ready for Surface Dressing
wpe21.jpg (4381 bytes) Slurry Seal operations
wpe22.jpg (4902 bytes) Typical road surface after a hot mix overlay
wpe23.jpg (4421 bytes) Chip and spray operation
wpe24.jpg (4448 bytes) Typical "tray-testing" of the surfacing works
Rehabilitation of Urban Roads on the Copperbelt - Rehabilitation of Freedom Way supervised by Zulu Burrow Consulting Engineers - Contractor, GM International:
wpeF.jpg (3581 bytes) Freedom Way - Rolling of Cold-mix Asphalt using Pneumatic rubber roller
wpe10.jpg (4235 bytes) Freedom Way - Paving of Cold-mix Asphalt in progress using paver
wpe11.jpg (4427 bytes) Freedom Way - Work in progress, truck tipping Cold-mix Asphalt
Rehabilitation of Luangwa Bridge by Joint Venture Zulu Burrow/Cowi Consulting Engineers - Contractor, Hoffman & Sons/Murray Roberts:
wpeB.jpg (5324 bytes) Rehabilitation of Luangwa Bridge - Travelling Girder in Position 3
wpe9.jpg (3326 bytes) Rehabilitation of Luangwa Bridge - New Cables installed and partially stressed
wpeD.jpg (3356 bytes) Rehabilitation of Luangwa Bridge - New Cables installed for stressing
Rehabilitation of Lusaka-Chipata (Great East Road)  by Zulu Burrow Consulting Engineers,   Contractor - Astaldi International:
wpe12.jpg (4495 bytes) Lusaka-Chipata   Pothole Repairs Km 172 + 200
wpe11.jpg (4077 bytes) Lusaka-Chipata Road Reconstruction - Surface Dressing - Km 152 + 430
wpe13.jpg (4348 bytes) Lusaka-Chipata Road Construction of Deviation on Km 198 - 800, 199 + 530
wpe14.jpg (3570 bytes) Lusaka-Chipata Road - Part of Primed Base - Km  153 - 500, Km 155 - 900
Rehabilitation of M1 (Mpika Kasama Road) in Mpika, Northern Province by Rankin Engineering Consultants and Contractor - Group Five Roads :
wpe5.jpg (3523 bytes) M1 - Mpika Kasama, Northern Province at initial stage
wpe7.jpg (4054 bytes) M1 - Mpika, Northern Province - Reconstruction stage - Project undertaken by Rankin Engineering.
wpe7.jpg (4163 bytes) M1 - Mpika, Northern Province - Single Seal Operation
wpe8.jpg (3576 bytes) M1 Road after Reconstruction by Ranking Engineering.
wpe9.jpg (4535 bytes) Inspection of M1 Road by Minister, Works and Supply
Section of the Lua Luo/Andrew Mwenya Road, Rehabilitated by Joint Venture Asco/Turner Construction in   Northern Province of Zambia:
wpe3.jpg (3455 bytes) Plate No. 1 Lua Luo Road in Kasama before rehabilitation (Kasama) under Road Fund
wpe8.jpg (3985 bytes) Plat No. 2 Start of Lualuo Road at junction with Zambezi Road exhibiting signs of loose material - Project executed by ASCO Ltd under Road Fund
wpeE.jpg (3586 bytes) Plat No. 3 Towards end of Lualuo road (Kasama Northern Province) - Rehabilitation undertaken by Asco under Road Fund.
wpeF.jpg (3591 bytes) Plate No. 4 Lualuo same stretch of  Road before rehabilitation (Kasama Northern Province) -  Project by Asco.
Livingstone Airport Road after periodic maintenance undertaken in 2001 with financing from the Road Fund
A Section of Luanshya-Mpongwe Road upgraded with direct GRZ funding
Ngwerere Road after a maintenance programme involving National Roads Board and the Ngwerere Community in 2001
Mbala-Kambole Road rehabilitated with IDA financing in Northern Province.  Work executed by Grinaker/Sable Joint Venture
Buteko Avenue in Kalulushi (2.7km).  One of the 5 Copperbelt towns that was funded by NRB at a cost of K6.6b Turnkey type of contract was used in all the towns and provincial capitals
crossing on a dambo along Matipa-Mofu Road rehabiliated with IDA financing in Northern Province.  Work was done by Grinaker/Sable Joint Venture